Directed Electronics Automate 210D Instructions d'exploitation Page 10

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 188
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 9
Note to Users of Verified Balances Approved for Use
as Legal Measuring Instruments:
Linearization after Transport
After transport, the linearity and calibration of your
balance may be out of the permissible tolerances
(see the “Specifications”). Always carry out internal
linearization of the balance after transport.
Repeating this procedure – several times, if necessary –
enhances the linearization. This procedure is described
on page 1–35.
Preparing a Verified Balance for Use as a Legal
Measuring Instrument:
After initially connecting the balance to AC power
(or after a relatively long power outage), allow
it to warm up for at least 24 hours.
1–6
Vue de la page 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 187 188

Commentaires sur ces manuels

Pas de commentaire