Directed Electronics equalizer 2500 Guide de l'utilisateur Page 98

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 154
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 97
Perform a Rapid Run
88
Part # 15035786 Rev. D
Figure 40 Flow Cell Lever in Position 1
6 Wait for about 5 seconds, and then slowly move the flow cell lever to position 2 (far-
right). When the flow cell lever is solid green, the manifolds are in position and the
flow cell is ready for use.
Figure 41 Flow Cell Lever in Position 2
7 Enter the flow cell ID.
NOTE
You can use a TruSeq Rapid flow cell or a HiSeq Rapid v2 flow cell for priming.
8 Make sure that the Vacuum Engaged checkbox is selected on the load prime flow cell
screen, and then select Next.
Confirm Proper Flow
After the used flow cell is loaded, check for proper flow. Checking for proper flow confirms
that the flow cell and gaskets are properly installed and the manifold is engaged.
1 Select solution 2 (laboratory-grade water) from the drop-down list.
Vue de la page 97
1 2 ... 93 94 95 96 97 98 99 100 101 102 103 ... 153 154

Commentaires sur ces manuels

Pas de commentaire